Is Jebel Ali Port Operating? 2026 Status Timeline and the Ports UAE Exporters Use Now
Is Jebel Ali port operating? A dated 2026 timeline from DP World, WAM and carrier notices, what "operating" means while the Strait of Hormuz is closed, the ports cargo uses instead and how goods ship from Dubai to Africa now.

Short answer: Is Jebel Ali port operating? Yes. DP World says Jebel Ali has stayed open and fully operational, with no physical damage, since the Strait of Hormuz closed. Very few mainline ships call, though, so most cargo now moves by road or rail between Jebel Ali and ports outside the strait, such as Khor Fakkan, Fujairah, Sohar, Salalah and Jeddah.
Is Jebel Ali port operating is one of the questions UAE exporters and African importers type most often in 2026, and the answers online mix old alerts with new ones. One logistics site still shows a line saying the port "has suspended all operations", from a notice that lasted hours, not months. This guide puts the official statements in date order, explains what "operating" means while the strait is closed, and shows how cargo for Africa leaves the UAE now.
Is Jebel Ali port operating today?#
Yes, with a big caveat. Jebel Ali is open: its four container terminals work, cargo is cleared, stored and distributed there, and DP World says total disruption since the start of the crisis has been limited to six hours. What has changed is the sea traffic. Ships calling at Jebel Ali have to pass through the Strait of Hormuz, and on 22 November 2026 the IMF PortWatch count reported by the straits.live tracker was 1 vessel through the strait, against a typical 85 a day before the crisis.
So the honest answer has two parts. The port operates. Direct shipping to and from it is still very limited, and most container lines have moved their UAE calls to ports outside the strait.
Need this handled end to end?
Tell us your lane and cargo profile and we'll come back with a routing plan and an all-in rate.
Jebel Ali status timeline: 9 dated updates#
| Date | What happened | Source |
|---|---|---|
| Late Feb to early Mar 2026 | The Strait of Hormuz closes to normal commercial traffic; on 25 Nov 2026 straits.live counts day 269 of the closure | straits.live |
| 1 Mar 2026 | Precautionary suspension of activity at all four terminals after a berth fire caused by debris from an aerial interception; DP World then confirms all four terminals fully operational | Gulf News |
| 4 Mar 2026 | DP World says all terminals at Jebel Ali are operating normally | WAM (Emirates News Agency) |
| Mar 2026 | With its 2025 results, DP World says Jebel Ali is fully operational with no infrastructure damage, but inbound vessel traffic has declined | AGBI |
| Jul 2026 | DP World announces two new terminals on the UAE east coast at Fujairah, outside the strait | DP World |
| 13 Aug 2026 | First half results: Jebel Ali "remains fully operational with no physical damage", but the conflict "has temporarily reduced vessel traffic"; Q2 volumes were reported down 90.1% to about 374,000 TEU | DP World, trade press |
| Sep 2026 | DP World plans to grow its own truck fleet from 700 to 1,000 for land bridge routes to Fujairah, Salalah and Jeddah | TT News (Bloomberg) |
| 11 Nov 2026 | DP World says over 1 million TEU moved by road and rail from east coast ports to Jebel Ali and UAE markets between early March and the end of October | TradeArabia |
| 18 Nov 2026 | Maersk accepts limited bookings to Jebel Ali and Abu Dhabi via Fujairah; most bookings from the UAE and Oman stay suspended | Maersk |

Two cautions on the timeline. Carrier rules change week by week, so the Maersk line is a snapshot of one carrier on one date. And the volume figures are DP World's or trade press reports of them; the company's own release gives group throughput with and without Jebel Ali, not a port figure.
What the official sources say#
The clearest statements come from DP World itself and the UAE news agency:
- March: on 1 March 2026, Gulf News reported a "temporary precautionary suspension" at all four terminals after a fire at one berth, followed by DP World's confirmation that all four were fully operational again. Three days later, WAM carried DP World's statement that all terminals were operating normally.
- August: DP World's first half 2026 results, published 13 August, said lower Jebel Ali activity offset growth elsewhere. Group throughput fell 5.7% to 42.8 million TEU, while throughput excluding Jebel Ali rose 5.4% to 39.7 million TEU. The gap between the two implies about 3.1 million TEU at Jebel Ali in the half, against about 7.8 million a year earlier.
- November: on 11 November, TradeArabia reported DP World's figures for the land corridors: about 3,500 TEU a day through them, a trucking network of over 3,000 trucks (700 owned by DP World), the new Jebel Ali Rail Terminal, and routes through Sohar and Duqm in Oman and Jeddah in Saudi Arabia.
The same November statement says nine Asian shipping lines have expressed interest in returning, and that carriers expect services and volumes could recover within one to three months once safe passage through the strait is restored.
How cargo moves through Jebel Ali now#
During the closure, Jebel Ali works less as a seaport and more as an inland hub. Import containers land at ports outside the strait and travel by bonded truck or rail to Jebel Ali for customs clearance, storage and distribution. Export cargo makes the reverse trip: it is packed in the UAE and moved by road to a port where ships still call.
| Port | Country | Coast | Role during the closure |
|---|---|---|---|
| Khor Fakkan | UAE | Gulf of Oman | Main UAE east coast gateway, linked to inland depots |
| Fujairah | UAE | Gulf of Oman | Gateway with road links; new DP World terminals planned |
| Sohar | Oman | Gulf of Oman | Land bridge from the UAE by road |
| Salalah | Oman | Arabian Sea | Transshipment hub and land bridge port |
| Jeddah | Saudi Arabia | Red Sea | Red Sea gateway linked by road |

The land leg is not free. A DP World executive told Bloomberg in September that moving goods from Europe to the Gulf over land typically costs three to four times as much as sea. Carriers' "land bridge" tariffs within the Gulf vary by route and change often, so always ask what a quote includes.
What this means if you ship from Dubai to Africa#
For most importers in Ghana, Nigeria, Kenya and the rest of Africa, the useful question is not whether Jebel Ali is open but where their cargo actually loads. Our sea cargo currently loads at one of our partner ports: Sohar (most used) or Salalah in Oman, Jeddah, Khor Fakkan or Fujairah. Your booking confirms the port and the sailing, and our ocean freight service page explains what we handle from the UAE.
Our sea freight estimates already include moving the cargo from Dubai to the partner port, so the land bridge does not appear as a separate line. Full container estimates also include haulage from the warehouse to the port of loading, export clearance and documentation. Every figure is an estimate that depends on the product and the country; destination charges, duty and clearance are extra.
| Destination | Shared space (LCL) estimate | 20ft container estimate | Days at sea |
|---|---|---|---|
| Tema, Ghana | about USD 340 per CBM | about USD 10,500 to 12,500 | about 30 to 48 |
| Lagos, Nigeria | about USD 376 per CBM | about USD 11,300 to 13,500 | about 30 to 48 |
| Mombasa, Kenya | about USD 376 per CBM | about USD 8,900 to 10,600 | about 22 to 40 |
| Durban, South Africa | about USD 384 per CBM | about USD 10,100 to 12,000 | about 28 to 46 |
Shipments under 1,000 kg pay a weight band when it is higher than the CBM charge, so check your load in the shipping calculator. We recommend shared space up to roughly 30 CBM, then a 40ft. Our guide to container shipping cost from Dubai to Africa lists the 20ft and 40ft estimates port by port, and how long it takes to ship from Dubai gives the days at sea for all 54 destinations.

Shipping from Dubai while Jebel Ali has few ship calls?
Send the goods, the CBM and weight and the destination port, and we will confirm the partner port, the sailing and an estimate that already includes the move from Dubai to the port.
How to check Jebel Ali's status yourself#
Port status changes faster than any article, so use sources that carry a date:
- DP World statements and results: the operator's news page and trading updates give the official status and volumes.
- Your carrier's advisory: shipping lines publish Middle East operational updates with the ports they accept bookings to and from, and the date.
- Strait traffic: trackers based on IMF PortWatch, such as straits.live, show how many ships pass through the strait each day.
- Your forwarder: ask in writing which port your cargo loads at, whether the sailing is direct or transshipped, and whether the road leg is in the price.
Treat any undated "Jebel Ali suspended" or "Jebel Ali fully back to normal" line as out of date until you find the date behind it. For the wider picture of how UAE goods reach Africa, see our guide to Strait of Hormuz shipping from Dubai to Africa, and for what the UAE actually ships to African markets, our UAE exports to Africa data guide.
Frequently asked questions#
Is Jebel Ali Port open for business?#
Yes. DP World says Jebel Ali has remained open and operational throughout the Strait of Hormuz closure, with disruption limited to six hours, and its terminals, customs clearance and free zone keep working. What is limited is direct shipping: few vessels pass through the strait, so most cargo reaches or leaves Jebel Ali by road or rail through ports such as Khor Fakkan, Fujairah, Sohar, Salalah and Jeddah.
Are ports in Dubai open?#
Yes. Jebel Ali, Dubai's main port, is open, and DP World has said all its terminals operate normally. Because ships must cross the Strait of Hormuz to reach Dubai, though, most container lines now call at ports outside the strait instead, and cargo travels between them and Dubai by truck or rail. Check your carrier's latest advisory for the ports it accepts bookings to.
Send your cargo details for a same-day quote#
Tell us what you are shipping from Dubai, the CBM and weight, and the destination port in Africa. We will confirm shared space or a container, the partner port and the sailing, and handle customs clearance at destination through our partner agents, or hand over to your own clearing agent. All prices are estimates that depend on the product and are confirmed when you book.
Request a same-day quote or message us on WhatsApp with your cargo details.
